Nuclear reactor cooling arrangement having a stirling engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11302452
APP PUB NO 20200141351A1
SERIAL NO

16620553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor cooling and power generation system according to the present disclosure includes a reactor vessel, a heat exchange section formed to receive heat generated from a core inside the reactor vessel, from a feedwater system through a fluid, and an electric power production section. A Stirling engine is provided to produce electric energy using the energy of the fluid whose temperature has increased while receiving the heat of the reactor. The system is formed to circulate the fluid that has received heat from the core in the heat exchange section through the electric power production section. The system operates even during a normal operation and during an accident of the nuclear power plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ATOMIC ENERGY RESEARCH INSTITUTEDAEJEON 34057
KING ABDULLAH CITY FOR ATOMIC AND RENEWABLE ENERGYP O BOX 2022 RIYADH 11451

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Youngmin Daejeon, KR 8 13
Chang, Cheongbong Daejeon, KR 6 3
Cho, Bonghyun Daejeon, KR 7 4
Han, Hunsik Sejong, KR 4 3
Kee, Junewoo Pohang-si, KR 4 3
Kim, Youngin Daejeon, KR 19 110
Lee, Minkyu Daejeon, KR 42 505
Park, Kisun Icheon-si, KR 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00