Arrangement for assembling rechargeable batteries into a battery module and a battery module

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11302980
APP PUB NO 20190259993A1
SERIAL NO

16276610

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement for assembling rechargeable batteries into a battery module for a lift-truck, the rechargeable batteries including a base plate configured to support a respective bottom surface of at least a first and a second rechargeable battery and comprising a holder configured to fixate the position of the at least first and second rechargeable battery onto the base plate, and a cover plate configured to be arranged on a respective top of the at least first and second rechargeable battery and comprising an electrical contact configured to electrically connect the at least first and the second rechargeable battery in series, and at least a first and a second attachment for interlocking the base plate and the cover plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA MATERIAL HANDLING MANUFACTURING SWEDEN AB595 81 MJÖLBY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Olofsson, Håkan Linköping, SE 18 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00