Nozzle assembly for a solid fuel burner and method of operating a nozzle assembly for a solid fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11305302
APP PUB NO 20210220848A1
SERIAL NO

16749407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nozzle tip for a pulverized solid fuel pipe nozzle of a pulverized solid fuel-fired furnace is provided. The nozzle tip includes a primary shroud having an inlet end and an outlet end, and an outlet at the outlet end for the passage of a pulverized solid fuel into the furnace. An area of the outlet is selectively adjustable to vary an exit velocity of the pulverized solid fuel from the nozzle tip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dunnu, Gregory Nuertingen, DE 3 1
Gollnick, Reinhard Weissach im Tal, DE 1 1
Heimann, Jakob Stuttgart, DE 2 1
Pimenov, Wadim Ostfildern, DE 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00