Controlling contamination in hydrogen production from water-reactive aluminum

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11318437
SERIAL NO

17243528

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for controlling contamination in hydrogen production from water-reactive aluminum includes at least one reaction vessel. For example, each reaction vessel may include a container, a conduit, and a plurality of baffles. The container may define a volume, and the conduit may define an orifice outside of the container and spaced away from the container. The plurality of baffles may be disposed in the volume to form a tortuous flow path through the volume to the orifice of the conduit to facilitate rapid production of a large quantity of hydrogen from water-reactive aluminum while reducing the likelihood that ejecta, aerosols, or a combination thereof, may escape the reaction vessel to interfere with end-use of the hydrogen produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LTAG SYSTEMS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Slocum, Alexander H Bow, US 201 4739
Slocum, Jonathan T Bow, US 30 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00