Blade plate for crusher, and crusher

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11318473
APP PUB NO 20200197944A1
SERIAL NO

16620958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blade plate for a crusher, where in the blade plate is normally installed on a fixed side or a movable side, includes a base material part, and a large number of blade parts arranged on a surface of the base material part. The blade parts include a rhombic blade part that forms a rhombic blade at a corner between inclined portions and a mountain-shaped blade part that is formed in a polyhedron shape in which a cross-shaped tip blade is formed at a corner between chipped portions provided at inclined portions. An inclined blade is formed at a corner between the inclined portions and is coupled to the rhombic blade part at an intersection point of diagonals of the rhombic blade part and a crusher using the blade plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YUATSUKI CO LTDNISHO-CITY AICHI 4440316

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okuya, Yasuaki Aichi, JP 14 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00