Ground improvement apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11319687
SERIAL NO

17501279

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ground improvement apparatus includes: an inner shaft arranged inside an outer pipe and including a mechanism for rotating a crank at a rotation speed four times as fast as that of the outer pipe; agitation blades supported by the outer pipe so as to reciprocate in a radial direction of the outer pipe and including discharge outlets; and a slider crank mechanism for converting a rotation movement of the crank to a reciprocating movement of the agitation blades. A ground at a location where the outer pipe is penetrated and a solidifying material discharged from the discharge outlets are agitated and mixed with each other to form an improved body having a substantially rectangular cross section by rotating the agitation blades while advancing and retreating the agitation blades relative to each other via the slider crank mechanism by rotation of the crank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUDO TETRA CORPORATION4-2-16 HIRANOMACHI CHUO-KU OSAKA-SHI OSAKA 541-0046

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imai, Yuki Tokyo, JP 11 16
Nozu, Mitsuo Tokyo, JP 3 0
Yamashita, Yuji Tokyo, JP 79 892

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00