Bolt for use in bolt action upper receiver for AR rifle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11320219
APP PUB NO 20200386495A1
SERIAL NO

16818960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bolt action AR rifle can be prepared using a standard AR lower assembly and coupling it to a bolt action upper assembly. The bolt action upper assembly has a bolt action receiver containing a bolt. The method of forming a bolt action AR rifle can include: providing the bolt action upper receiver assembly; providing the standard AR lower AR receiver assembly having a pivot pin and takedown pin; inserting the pivot pin into the pivot pin receiver hole; pivoting the bolt action upper receiver assembly at the pivot pin until the takedown pin is aligned with the takedown pin receiver hole; and inserting the takedown pin into the takedown pin receiver hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UINTAH PRECISION LLC21300 WEST HIGHWAY 40 DUCHESNE UT 84021

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamilton, Richard Duchesne, US 15 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00