Hammer tacker

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11325234
APP PUB NO 20210178565A1
SERIAL NO

16717650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hammer tacker is provided, including a grip portion and a body portion; a magazine, including a rail, at least partially received in the housing, being movable relative to the housing between a stapling position and a staple-installing position, including an outlet disposed at a front end of the body portion; a biasing mechanism, including a push member movably mounted to the rail and a constant force spring which is rollable, the constant force spring being positionally attached to the rail through a connection portion and located at a front end of the magazine, and the constant force spring being attached to an inner face of the push member, the push member being movable to be correspondingly above or beyond the connection portion; a striking mechanism, mounted to the body portion and configured to strike at least one staple installed in the magazine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APEX MFG CO LTDNO 68 KUANG-CHENG ROAD TALI DISTRICT TAICHUNG CITY 412

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Chih-Wei Taichung, TW 98 509

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00