Alternating current power input socket

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11329435
APP PUB NO 20210075166A1
SERIAL NO

17003519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An AC power input socket includes a casing and at least two conductive pins. The casing comprises a connection side and an output side based on performance of the AC power input socket. The casing is provided with an accommodating groove at the connection side, each of the two conductive pins includes a power connection section located in the accommodating groove, an output section extending from the power connection section and passing through the casing to be exposed on the output side, and a capacitor connecting section extending from an end of the output section. Each of the conductive pins is provided with a through hole in the output section for disposing an electric wire, and the capacitor connecting section provides a capacitor pin to be connected thereon, so that the capacitor pin and the electric wire do not need to be disposed at a same hole position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOTRANS TECHNOLOGY CO LTD6F NO 18 LN 270 SEC 3 BEISHEN RD SHENKENG DIST NEW TAIPEI CITY 222

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Tsung-Han Keelung, TW 11 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00