Arrangement for accumulation and evacuation of defrosting and condensation water from refrigeration and cooling units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11333423
APP PUB NO 20200080764A1
SERIAL NO

16466399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Arrangement for accumulation and evacuation of water such as defrosting and condensation water from refrigeration units, the system including a piping arrangement with a vertical pipe section extending from a water evacuation unit provided in conjunction with the respective refrigeration unit; discharge valves, one for each unit; one or more liquid reservoir for each unit; one or more vacuum pumps; air inlet nozzles; a control unit; one or more level switches and air conduit inlet opening for each vertical pipe. Each of the water evacuation units includes a docking station and a water collection tray preferably to be slideably provided within the docking station, whereby each unit is custom made to fit between the refrigeration unit and floor where the refrigeration units are placed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JETS AS6060 HAREID

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dybvik, Werner Langevåg, NO 1 1
Rønnestad, Tor Ålesund, NO 2 3
Skomsøy, Jan Helge Ålesund, NO 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00