Power conversion circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11336188
APP PUB NO 20210376740A1
SERIAL NO

16639978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a power conversion circuit for achieving a power conversion device capable of suppressing charging/discharging of a parasitic capacitor caused by high-frequency switching, and of reducing a loss of a semiconductor switching element. The power conversion circuit includes: a circuit board including a plurality of layers including two or more layers, on which circuit patterns are formed; and a plurality of semiconductor switching elements connected to the circuit patterns of the circuit board, and configured to perform switching for power conversion. In the circuit board, a plurality of control ground patterns for different nodes, which are configured to drive the plurality of semiconductor switching elements, are arranged so as not to overlap one another in plan view.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayase, Kei Tokyo, JP 11 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00