Hand tool with a handle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11338428
APP PUB NO 20190126457A1
SERIAL NO

16232265

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hand tool includes a handle, a press member, a shank body and multiple latch assemblies. The handle is formed with a receiving cavity and a locating hole in communication with the receiving cavity. The press member is movably disposed in the locating hole. The shank body is fitted in the receiving cavity and movable relative to the handle. The shank body is formed with multiple sockets. The latch assemblies are respectively mounted in the sockets. When the shank body is moved, (for example, slid or rotated) relative to the handle to make one of the sockets aligned with the locating hole, the latch assembly latches the shank body with the handle. When pressing the press member, the latch assembly unlatches the shank body from the handle, the shank body is movable relative to the handle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABO TOOL COMPANYNO 367 PEI YANG ROAD FENG YUAN DISTRICT TAICHUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Chih-Ching Taichung, TW 479 3041

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00