Fluid circuit with integrated electrostatic discharge mitigation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11339063
APP PUB NO 20190337823A1
SERIAL NO

16287847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid circuit includes a plurality of tubing segments and a plurality of operative components. Each tubing segment includes i) a non-conductive polymer portion defining a fluid passageway and ii) one or more interior conductive fluoropolymer stripes extending axially to the ends of each of the respective tubing segments. Each operative component includes a conductive fluoropolymer that extends between a plurality of tubing connector fittings forming a part of the fluid circuit, wherein each of the tubing connector fittings conductively connect the respective conductor of the operative component to the interior conductive fluoropolymer stripes of the tubing segment to provide a path to ground that extends through each operative component and each tubing segment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ENTEGRIS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gregerson, Barry Lee Excelsior, US 9 6
Leys, John Chaska, US 8 61
Linder, James C Victoria, US 16 172
McKenzie, Jeffrey James Watertown, US 2 6
Reichow, Brett Christopher Chanhassen, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00