Balanced bridge bleeder brake with HLA

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11339690
APP PUB NO 20210131318A1
SERIAL NO

17146443

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A valvetrain assembly configured to selectively perform a bleeder brake operation includes a rocker arm configured to rotate about a rocker shaft, a camshaft having a lobe configured to impart motion to the rocker arm through a pushrod, and a valve bridge assembly operably associated with the rocker arm and configured to be selectively engaged by the rocker arm to open at least one of a first and second engine valve. An engine brake capsule is operably associated with the valve bridge assembly and configured to operate in a drive mode where the engine brake capsule does not cause the valve bridge assembly to open the first or second engine valves, and a brake mode where the engine brake capsule engages the valve bridge assembly to partially open the first engine valve to perform the bleeder brake operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDDUBLIN 4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Andrew Kalamazoo, US 155 8193
Vanwingerden, Mark Battle Creek, US 18 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00