Hydraulic Y-tool system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11346194
APP PUB NO 20220074290A1
SERIAL NO

17016817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A submersible pump system includes a Y-tool system including a Y-Block having a production tubing branch, a submersible pump branch, and a bypass branch, an electrical submersible pump coupled to the submersible pump branch, a valve assembly coupled to the bypass branch, and a hydraulic system coupled to the valve assembly, the hydraulic system providing a hydraulic fluid to a chamber of the valve assembly. A method includes lowering production tubing into a wellbore, the production tubing including a submersible pump system with a Y-tool system including a Y-Block, and actuating a valve assembly disposed in a bypass tubing coupled to a bypass branch of the Y-Block to open or close a bore of the bypass tubing, the actuating including providing a hydraulic fluid to a chamber of the valve assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYP O BOX 5000 DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Ghamdi, Saeed Mohamed Dammam, SA 1 7
Al-Shinaiber, Fahad Abdulaziz Al Khobar, SA 1 7
Al-Somali, Abdullah Ahmed Dhahran, SA 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00