Process for producing plastic lens and apparatus for producing plastic lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11358354
APP PUB NO 20190091953A1
SERIAL NO

15735706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a plastic lens includes a step of stirring and mixing a solution including a polymerization reactive compound in a preparation tank; a step of transferring the polymerizable composition obtained in the step from the preparation tank to a lens casting mold; a step of curing the polymerizable composition; and a step of obtaining a plastic lens molded product by separating the obtained resin from the lens casting mold. The step of transferring the polymerizable composition includes a step of re-mixing the polymerizable composition discharged from the preparation tank and injecting the polymerizable composition into the lens casting mold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI CHEMICALS INCTOKYO 104-0028

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuya, Masayuki Arao, JP 38 112
Ito, Shinsuke Omuta, JP 58 251
Nishimura, Takeshi Yanagawa, JP 185 1873
Suesugi, Kouji Arao, JP 18 42
Tanaka, Mamoru Fukuoka, JP 76 1040

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00