Composite road module, unit and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11359337
APP PUB NO 20200224370A1
SERIAL NO

16626120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A present invention relates to a composite road module, unit and system. The composite road module comprising a first road and a second road extending substantially in parallel, one of the first road and the second road being configured for vehicles to travel according to a left-hand traffic rule, the other being configured for vehicles to travel according to a right-hand traffic rule, the first road comprising a first lane and a second lane, the second road comprising a third lane and a fourth lane, wherein the first lane and the third lane are in communication with each other, and are provided for vehicles to travel in a first direction, and wherein the second lane and the fourth lane are in communication with each other, and are provided for vehicles to travel in a second direction opposite to the first direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DU KUAI TONG (BEIJING) TRAFFIC DISPERSION EQUIPMENT CO LTDROOM 1701-1703 NO 37 NANMOFANG ROAD CHAOYANG DISTRICT BEIJING 100022

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Huidong Beijing, CN 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00