Smokeless fire pit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11359816
APP PUB NO 20180195732A1
SERIAL NO

15870544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion device includes a combustion chamber with an outer wall enclosing a combustion space that can contain a fuel source on an adjustable fuel rack, side walls, a lower air jet tube and at least one air upper jet tube, a top opening, a grill top assembly to cover the opening, and a detachable power module. The power module can have batteries and a blower. The blower can force ambient air into a manifold, through the jet tubes, through ports in the jet tubes, and into the combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOLITE LLC65 JAY STREET 4TH FLOOR BROOKLYN NY 11201

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbruzzi, Melinda Brooklyn, US 7 29
Cedar, Jonathan N Brooklyn, US 15 115
Connelly, Timothy M Brooklyn, US 13 201
Drummond, Alexander H Portland, US 11 163
Gist, David Ryan Brooklyn, US 5 15
Grind, Steven Michael Brooklyn, US 2 11
Iyer, Venkatesh R Brooklyn, US 4 27
Zelnick, Benjamin E Brooklyn, US 3 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00