Surface treated copper foil, copper clad laminate, and printed circuit board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11382217
APP PUB NO 20210362475A1
SERIAL NO

16498010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surface treated copper foil 1 includes a copper foil 2, and a first surface treatment layer 3 formed on one surface of the copper foil 2. The first surface treatment layer 3 of the surface treated copper foil 1 has a Ni concentration of 0.1 to 15.0 atm % based on the total amount of elements of C, N, O, Zn, Cr, Ni, Co, Si, and Cu, in an XPS depth profile obtained by performing sputtering at a sputtering rate of 2.5 nm/min (in terms of SiO2) for 1 minute. A copper clad laminate 10 includes the surface treated copper foil 1 and an insulating substrate 11 adhered to the first surface treatment layer 3 of the surface treated copper foil 1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JX NIPPON MINING & METALS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miki, Atsushi Ibaraki, JP 78 1365
Miyamoto, Nobuaki Ibaraki, JP 21 291

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00