Lubricant additive and method for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11384307
APP PUB NO 20210222081A1
SERIAL NO

17205886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lubricant additive may be synthesized by forming a nanohybrid of a transition metal dichalcogenide and a metal borate, forming a base oil, and then dispersing the transition metal dichalcogenide into the base oil. An exemplary nanohybrid may be synthesized by forming a first solution by adding a borax solution to an aqueous solution of a metal source, forming a second solution by adding ethanol to the first solution, forming a mixture by mixing the transition metal dichalcogenide with the second solution, and heating the mixture at a temperature of 180° C. to 230° C. and a pressure of 5 to 20 bar under a nitrogen atmosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALAEI MAHSHADTEHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alaei, Mahshad Tehran, IR 3 4
Rashidi, Alimorad Tehran, IR 17 137
Rayatdoost, Saiedeh Tehran, IR 1 0
Soleymani, Mohammad Karaj, IR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 12, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00