Method of manufacturing heat sink and heat sink

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11389911
APP PUB NO 20210138592A1
SERIAL NO

17061467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a heat sink includes a rib portion forming step of forming a rib portion on a substrate having a flat plate shape in such a manner that a first groove and a second groove are formed on a front surface side of the substrate by plastically deforming the substrate by a press thus forming the rib portion in a region sandwiched between the first groove and the second groove. The method further includes a back surface protruding ridge portion cutting removal step of removing protruding ridge portions formed on a back surface side of the substrate by cutting. The method further includes a fin forming step of forming a plurality of fins by working the rib portion; and a heat sink separating step of obtaining the heat sink by separating a portion within a predetermined range which includes the fins from the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAKAMURA MFG CO LTD493-1 MIKKAMACHI MINOWA-MACHI KAMIINA-GUN NAGANO 399-4603

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arai, Kazuto Nagano, JP 2 26
Takahashi, Keiichi Nagano, JP 92 716

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00