Front axle beam and production method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11390116
SERIAL NO

16499454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The production method disclosed is a method for producing a front axle beam. The production method includes a die forging step and a bending step. The die forging step is a step of forging a steel material with dies to produce a forged product including a rough web part, which is to be formed into a web part, and four plate-shaped rough flange parts protruding frontward and rearward from an upper side and a lower side of the rough web part, respectively. The bending step is a step of pressing at least one specified rough flange part, which is at least one of the four rough flange parts, with a first die to form a bent portion in the specified rough flange part such that the bent portion is bent inward in an up-down direction of the forged product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONCHIYODA-KU TOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Sam Soo Tokyo, JP 13 10
Imanishi, Kenji Tokyo, JP 81 1651
Ishihara, Koichiro Tokyo, JP 24 525
Tamura, Kenji Tokyo, JP 134 1171
Yabuno, Kunihiro Tokyo, JP 21 14
Yoshida, Kunihiro Tokyo, JP 18 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00