Convertible metallurgical furnace and modular metallurgical plant comprising said furnace for conducting production processes for the production of metals in the molten state, in particular steel or cast iron

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11391515
SERIAL NO

16465626

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metallurgical furnace including a vessel with a lower shell for containing a metal bath, the metal bath composed of molten metal and an overlying layer of slag. The lower shell is tiltingly supported and provided with a deslagging opening for evacuating the slag and a tapping opening for tapping the molten metal. The vessel includes an upper shell removably positioned on the lower shell and first and second inlet openings for feeding. The vessel includes a closing roof for the upper closing of the vessel removably positioned on the upper shell and a passage opening for the passage, through the same, of at least one electrode, at least one charge opening for feeding, through the same, charge material in the solid state. At least one of the inlet openings, passage opening, and charge opening is closed or associated with a closing element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENOVA S P A20149 MILANO
TENOVA INDUSTRIAL TECHNOLOGIES (BEIJING) CO LTD1700 AIR CHINA PLAZA 36 XIAOYUN LU BEIJING 100027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cattalini, Cristian Milan, IT 1 0
Giavani, Cesare Milan, IT 8 6
Reali, Silvio Maria Milan, IT 11 25
Virgili, Giuseppino San Fermo Della Battaglia, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00