Systems and methods for ozone water generation cell with integrated detection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11396462
APP PUB NO 20210139350A1
SERIAL NO

17041987

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel cell for generating ozonated water including an integrated ozone concentration detector. The cell comprises a nafion membrane separating a diamond coated anode, and a gold surfaced cathode enclosed within a cell housing with the catalyst side of the nafion membrane facing the cathode. The cell housing has a cathode housing portion and an anode housing portion separated by the membrane. The cathode and anode have an array of holes allowing fluid to penetrate to the surface of the niobium membrane. Ozonated water from the anode is channeled to a spectrophotometer integrated within the housing. The spectrophotometer creates a signal representative of the ozone concentration in the ozonated water which is utilized by control circuitry in a closed loop to maintain a stable target concentration. A bubble trap may be integrated within the housing through which the ozonated water passes before entering the spectrophotometer to remove bubbles form the ozonated water. Input ports allow fluid to flow into the housing and over the anode and cathode and then out of the housing through outlet ports.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHSTAR MEDICAL TECHNOLOGIES LLC1800 GATEWAY BLVD BELOIT WI 53511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lust, Dorian Madison, US 12 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00