Method for the production of a metal strip coated with a coating of chromium and chromium oxide using an electrolyte solution with a trivalent chromium compound

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11396713
APP PUB NO 20200190684A1
SERIAL NO

16711703

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the production of a metal strip coated with a coating. The coating containing chromium metal and chromium oxide and is electrolytically deposited from an electrolyte solution that contains a trivalent chromium compound onto the metal strip by bringing the metal strip, which is connected as the cathode, into contact with the electrolyte solution. An effective deposition of the coating with a high chromium oxide portion is achieved by successively passing the metal strip at a predefined strip travel speed through a plurality of electrolysis tanks arranged successively in a strip travel direction. The first electrolysis tank is set to a low current density; a second electrolysis tank, which follows in the strip travel direction, is set to a medium current density; and a last electrolysis tank is set to a high current density, where the low current density is greater than 20 A/dm2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THYSSENKRUPP RASSELSTEIN GMBH56626 ANDERNACH
THYSSENKRUPP AG45143 ESSEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marmann, Andrea Piesport, DE 9 10
Molls, Christoph Bonn, DE 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00