Aircraft turbine engine mechanical reduction gear

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11396846
APP PUB NO 20200284203A1
SERIAL NO

16810158

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbine engine mechanical reduction gear, for example, of an aircraft, the reduction gear comprising: a sun gear having an axis of rotation; a ring gear which extends around the sun gear and which is configured to be immobile in rotation about the axis; planetary gears which are meshed with the sun gear and the ring gear and which are supported by a planetary carrier which is configured to be mobile in rotation about the axis; at least one lubrication oil distributor which comprises a stator portion immobile in rotation and a rotating integral rotor portion of the planetary carrier; and an annular oil deflector which is integral with the ring gear, wherein the stator portion of the distributor is integral with the deflector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN AIRCRAFT ENGINES75015 PARIS
SAFRAN TRANSMISSION SYSTEMS92700 COLOMBES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foglia, Matthieu Bruno François Melun, FR 8 4
Simon, Adrien Louis Saint-Denis, FR 39 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00