High pressure recovery of carbon dioxide from a fermentation process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11397049
APP PUB NO 20180120024A1
SERIAL NO

15853023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A purification system for recovering carbon dioxide from a gaseous carbon dioxide stream originating from a fermentation process, brewery or a bottling line is provided. The purification system includes a compressor in fluid communication with an absorber. The compressor provides a compressed gaseous stream at a predetermined pressure and the absorber separates the compressed gaseous stream into a carbon dioxide rich gaseous stream and a contaminant rich stream. A condenser is designed to operate at a pressure of at least 30 bar and is designed to separate the carbon dioxide rich gaseous stream into a condensate and a purge gas. A distillation column is configured to separate the condensate into a second purge gas and a purified carbon dioxide stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNION ENGINEERING A/S7000 FREDERICIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Find, Rasmus Vejle, DK 16 88
Poulsen, Jan Flensted Vorbasse, DK 6 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00