Production of low carbon footprint magnesia

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11401168
APP PUB NO 20190270647A1
SERIAL NO

16320579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing magnesia can include contacting CO2-containing emissions with a magnesium-containing material to produce magnesium carbonate; subjecting the magnesium carbonate to calcination to produce a CO2 by-product and magnesia; and recycling at least a portion of the CO2 by-product for contacting the magnesium-containing material to produce the magnesium carbonate. The magnesium-containing material can include mining residues, such as phyllosilicate or chrysotile mining residue, and the magnesium carbonate produced can include precipitated nesquehonite that is subjected to calcination to produce the magnesia.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUT NATIONAL DE LA RECHERCHE SCIENTIFIQUE490 RYE DE LA COURONNE QUÉBEC G1K 9A9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blais, Jean-François Québec, CA 3 6
Cecchi, Emmanuelle Québec, CA 5 21
Kemache, Nassima Québec, CA 2 0
Mercier, Guy Québec, CA 24 233
Pasquier, Louis-César Québec, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00