Process for manufacture of hydroxide slurry

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11401183
APP PUB NO 20200317549A1
SERIAL NO

16908361

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacture of high-solids hydroxide slurries from caustic calcined carbonate powder is described, whereby the properties of the slurry are its low resistance to shear thinning to facilitate transport, a high stability for transport and storage, ease of reconstitution after long periods of storage, and, as required, a high concentration of chemically reactive species at the particle surface. The method achieves these specifications by mixing caustic calcined carbonate or hydroxide powder with water in an insulated reactor vessel, and agitating the slurry sufficiently such that the hydration reaction causes the water to spontaneously boil, such that the remaining hydration proceeds spontaneously under the fixed conditions of boiling through the water loss. The mixing process is preferably carried out by a shear pump. A viscosity modifier, such as acetic acid, is used to thin the slurry to enable the mixing system to maintain uniform mixing. The reaction is terminated when the boiling has spontaneously ceased and the temperature has spontaneously dropped to a set point though the reactor heat losses, where the processing time is sufficiently long that the slurry meets the desired specifications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALIX LTDPYMBLE NSW 2073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sceats, Mark Pyrmont, AU 29 171
Vincent, Adam Kent, GB 13 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00