Preparing and dispensing polymer materials and producing polymer articles therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11413591
APP PUB NO 20190126223A1
SERIAL NO

16176337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example system is used to mix components and dispense a mixture for forming a thiol-ene polymer article. The system includes a first reservoir containing a first component of the thiol-ene polymer including a first polymerizable compound, and a second reservoir containing a second component of the thiol-ene polymer including a second polymerizable compound. The system also includes a mixing vessel having a mixing chamber, a delivery manifold providing a conduit for fluid from the first and second reservoirs to the mixing vessel, and a dispensing manifold providing a conduit for fluid from the mixing vessel. The system also includes a control module programmed to control the operation of the system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CITIBANK N A388 GREENWICH STREET NEW YORK NY 10013

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhagat, Sharad D Austin, US 46 107
Chang, Chieh Cedar Park, US 56 619
Peroz, Christophe San Francisco, US 110 1428
Singh, Vikramjit Pflugerville, US 113 1087

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00