Prefabricated module for a building and construction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11421416
APP PUB NO 20210372117A1
SERIAL NO

17262575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a prefabricated module including, in one piece: a shower compartment, with a shower; a toilet compartment, with a toilet seat, the shower compartment and the toilet compartment being arranged longitudinally opposite one another; a kitchen compartment, which included a sink and a cooking appliance; a technical compartment, which included: a domestic water supply and a water heater, supplying domestic water to the shower and sink; an energy supply, supplying energy to the cooking appliance and the water heater; the kitchen compartment and the technical compartment being arranged between the shower compartment and the toilet compartment, which are transversely opposite one another, of the prefabricated module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LITTOW ARCHITECTES20 RUE HENRI REGNAULT PARIS 75014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Littow, Pekka Paris, FR 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00