Shunt resistor for detecting the status of an electrical energy storage unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11422157
APP PUB NO 20210156888A1
SERIAL NO

16610721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a shunt resistor (2) for detecting the status of an electrical energy storage unit (1), wherein the shunt resistor (2) comprises a first layer (4), a second layer (6) and a third layer (8). According to the invention, the layers (4, 6, 8) are arranged in a layered manner in a stacking direction (V), wherein the second layer (6) is arranged between the first layer (4) and the third layer (8), and wherein the layers (4, 6, 8) are in physical contact with one another at one of the sides having the greatest respective surface area, and wherein the layers (4, 6, 8) are arranged at least partially overlapping.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergmann, Sven Brackenheim, DE 22 52
Tzivanopoulos, Chrysanthos Remseck am Neckar, DE 24 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00