Manufacturing process for the production of a lipid-fiber powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11432562
APP PUB NO 20200337329A1
SERIAL NO

16758251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a manufacturing process for the production of a lipid-fiber powder. In particularly the invention relates to a process for the production of a lipid-fiber powder having between 40 to 78 wt % of oil or fat (by weight of total lipid-fiber powder) and 22 to 60 wt % of a vegetable fiber (by weight of total lipid-fiber powder), wherein the fiber is characterized by having a rate of hydration between 15 to 500 cP/min and wherein the oil or fat has a solid fat content (SFC) at 20° C. below 12 wt %.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCIETE DES PRODUITS NESTLE S ASWITZERLAND ZUG ZUG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bozon, Annabel Sheffield, GB 8 2
Fernandez, Farres Isabel Lausanne, CH 17 19
Gaddipati, Sanyasi Singen, DE 15 2
Kim, Youngbin Singen, DE 39 39
Perdana, Jimmy Singen, DE 19 3
Sagalowicz, Laurent Blonay, CH 28 122
Schroeder, Volker Heiligenberg, DE 14 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00