Methods of making sugar cone spheres

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11432563
APP PUB NO 20200128853A1
SERIAL NO

16666072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making sugar cone spheres is disclosed having an interior of an edible filling such as ice cream or frozen yoghurt encapsulated by a wafer. The method includes: baking a wafer dough mix on a heated waffle iron to produce a wafer, shaping the wafer into a shape by placing the wafer between an outer mold and an inner half mold and pressing the outer mold against the inner mold, cutting the wafer at a perimeter of the shape to produce a half-molded wafer shell, adding an edible filling to a cavity of the half-molded wafer shell, adding another edible filling to a cavity of another half-molded wafer shell, joining a perimeter of the half-molded wafer shell and a perimeter of the other half-molded wafer shell, and freezing the half-molded wafer shell and the other half-molded wafer shell together to produce a bite-size edible treat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZARRO JOHN JOSEPHNUTLEY NJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adams, Michael John Terrell, US 8 43
Zarro, John Joseph Nutley, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00