Method and process for upgrading lignite by collaborative optimization of drying and dry sorting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11434444
SERIAL NO

16972396

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed towards a process for upgrading lignite comprising: prior to production pre-assess the calorific value of the coal, by selecting a relational expression between a calorific value of lignite and a degree of metamorphism, a moisture content and an ash content thereof based on a ratio of the ash content to the moisture content, pre-assess the calorific value of the coal; combining a relational expression between a production cost and the ash content and moisture content to make a cost budget; determining degrees of deashing and drying; selecting and implementing a lignite ash reduction pretreatment process; and implementing dry sorting first and then drying. The upgrading process has high sorting efficiency, high drying efficiency and low production cost, and meets the requirement for the surface moisture of the raw coal in the dry sorting operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIVERSITY OF MINING AND TECHNOLOGYNO 1 DAXUE ROAD TONGSHAN XUZHOU JIANGSU 221116 221116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dong, Liang Xuzhou, CN 149 3190
Duan, Chenlong Xuzhou, CN 11 10
Luo, Zhenfu Xuzhou, CN 5 5
Yan, Guanghui Xuzhou, CN 3 0
Zhang, Bo Xuzhou, CN 1006 7322
Zhang, Yadong Xuzhou, CN 45 376
Zhao, Yuemin Xuzhou, CN 12 12
Zhou, Enhui Xuzhou, CN 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00