Women's tank top with built-in breast support

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11445768
SERIAL NO

14943015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a garment comprising a soft, knit tank top with a built-in, floating bra. The bra cups and front bridge are constructed with the same fabric as the tank top. Bra cups connect to the tank top partially along front neckline and are double-layered to provide space for removable and inter-changeable sized inserts for different levels of coverage. A floating back panel is made with a single-layer of compression fabric to provide tension support and anchor the front. The straps of the tank top are double-layered shell fabric and connect at a top of the shoulder to wide, flat-lock stitched vertical back bra straps made with compression fabric. This tank top with built-in bra support is a bra replacement worn as a stand-alone top garment or a layering piece underneath outer layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PURNELL, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dehlsen, James Brenton Santa Barbara, US 1 1
Womack, Brita Santa Barbara, US 2 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00