Construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11447929
SERIAL NO

16764225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The construction machine includes: an input interface which permits an input of a provisional target position of the attachment in a virtual space; a target position calculation part which calculates an actual target position that is a target position of the attachment in a real space from the provisional target position; an operational amount calculation part which calculates an operational amount required to make a current position of the attachment coincide with the actual target position of the attachment coincide with the actual target position with respect to at least one driven target selected from a lower traveling body, an upper slewing body, a working device, and the attachment; and a control part which controls an operation of one of the actuators for driving the driven target in accordance with the calculated target operational amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTD2-1 ITSUKAICHIKOU 2-CHOME SAEKI-KU HIROSHIMA-SHI HIROSHIMA 731-5161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takamura, Reona Tokyo, JP 6 19
Tanaka, Kiyokazu Tokyo, JP 14 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00