Oil pump including gap between flange portion of tubular core and flange-opposing portion of resin housing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11448211
SERIAL NO

16547959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An oil pump includes: a first core in which an inner rotor having external teeth and an outer rotor having internal teeth are housed; a housing having a recess in which the first core is held; a second core disposed in contact with the first core in an axial direction; and a cover having a holding hole in which the second core is held. The first core has a first recess/projection portion formed on a first axial end surface at a side opposite to an axial end surface opposing a bottom wall of the recess. The second core has a second recess/projection portion formed on a second axial end surface that is in contact with the first axial end surface. A gap is formed between opposing surfaces of the housing and the cover in a state where the first and second axial end surfaces are in contact with each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYODA GOSEI CO LTDKIYOSU-SHI AICHI 452-8564

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hattori, Takeshi Kiyosu, JP 58 544
Park, Seongjun Yokohama, JP 106 681
Sakai, Shinya Kiyosu, JP 10 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00