Double layer, single tube braid for footwear upper

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11457685
APP PUB NO 20180343957A1
SERIAL NO

15991840

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a braided footwear upper is provided. The method includes braiding a two-layer, single-tube structure with a first end that couples a first braided layer to a second braided layer, and second end that couples the first braided layer to the second braided layer of the tubular braided structure. The first end is proximate the second end. At least one yarn from the first end, and at least one yarn from the second end are braided with at least one draw yarn. The draw yarn is braided to be easily removable, such that the first end is selectively de-coupled from the second end. When the draw yarn is removed, the double-layer tubular braided structure is expandable to form a larger diameter tubular braided structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKE INCONE BOWERMAN DRIVE BEAVERTON OR 97005-6453

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruce, Robert M Portland, US 89 2341
Ichikawa, Chikao Gunma, JP 10 74
Ichikawa, Michihiro Gunma, JP 9 53
Lee, Eun Kyung Beaverton, US 217 1621
Yoo, James Y Beaverton, US 30 371

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00