Hydrocracking process and device with reduction of polynuclear aromatic compounds

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11459514
APP PUB NO 20180187101A1
SERIAL NO

15850658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the hydrocracking process in accordance with the invention, which comprises a hydrocracking section, a high pressure hot separator and a fractionation section, upstream of the fractionation section, a stripper or reboiler column type separation column is added which treats at least a portion of the heavy effluent obtained from the high pressure hot separator. All or a portion of the bottom fraction from said column, which is rich in polynuclear aromatic compounds, is purged. At least a portion of the bottom fraction obtained from the fractionation section, which is constituted by unconverted products, is recycled to the reaction section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AXENS89 BD FRANKLIN ROOSEVELT 92500 RUEIL-MALMAISON 92500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pupat, Nicolas Houilles, FR 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00