Precast and prestressed concrete tank with temporary construction opening

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11459782
APP PUB NO 20210079680A1
SERIAL NO

17104498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A precast, prestressed concrete tank and method that facilitates construction of a primary inner tank within a secondary outer tank, and which permits for the construction of the primary inner tank after the secondary outer tank has been erected, but without requiring insertion through a top of the secondary outer tank, or by tunneling underneath the secondary outer tank, is disclosed. The primary inner tank has an inner wall and the secondary outer tank has an outer wall (precast, prestressed concrete) and wire windings. The primary inner tank is disposed inside of the secondary outer tank. The secondary outer tank has a plurality of first precast outer wall panels, and a temporary construction opening frame. The temporary construction opening frame defines an access doorway during construction of the tank. The temporary construction opening frame is disposed on a foundation base slab.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRELOAD CRYOGENICS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mehta, Sanjay Hauppauge, US 90 1576
Reaman, Eric T Hingham, US 9 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00