Method for producing a braided preform, braided preform, fiber-reinforced component, and braiding machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11486070
APP PUB NO 20200130233A1
SERIAL NO

16725476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a braided preform, includes the steps of: a) creating a braided sleeve from filler threads and braiding threads in a braiding process, for which purpose the filler threads and braiding threads are taken off thread accumulators, b) feeding a core to the braided sleeve, c) continuing the braiding process, wherein the core is advanced such that it is braided along its length, wherein, during step c), the take-off of at least one filler thread is blocked such that the at least one filler thread is pulled out of at least one section of the braided sleeve surrounding the core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT80809 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eschler, Eric Munich, DE 1 0
Pfitzer, Hanno Furth, DE 6 6
Schaper, Sebastian Landshut, DE 2 0
Staudt, Bernhard Munich, DE 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00