Ladder, end cap and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11486199
APP PUB NO 20180179820A1
SERIAL NO

15592962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ladder for a user to climb and which holds a rag includes a first rail having a top and a second rail and rungs attached to the first rail and second rail. The ladder includes an end cap that is attached adjacent to the top of the first rail. The end cap having an attachment portion which attaches to the first rail and a cover portion which covers over the first rail, and extends from the attachment portion. The cover portion having a rag holder. The ladder includes a pad attached to the back of the cover portion which contacts a surface against which the first rail leans against so as not to mar or scratch or damage the surface. An end cap. A method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WERNER CO555 PIERCE ROAD SUITE 300 ITASCA IL 60143

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beggs, Robert Stoneboro, US 10 188
Jacobs, James Anthony New Castle, US 3 7
Mora, Daniel C Transfer, US 24 115
Sedlacek, Brent Elmurst, US 8 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00