Method of manufacture of scroll compressors and scroll compressors manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11486394
APP PUB NO 20200248688A1
SERIAL NO

16758476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method of manufacture of a scroll compressor (1), in particular for pretreatment for the coating of areas in contact with one another during operation of the scroll compressor (1). The scroll compressor (1) is developed with a non-movable spiral (3) with a base plate (3a) and a spiral-form wall (3b) extending from one side of the base plate (3a), as well as with a movable spiral (4) with a base plate (4a) and a spiral-form wall (4b) extending from a front side of the base plate (4a). The spirals (3, 4) are developed out of a basis material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANON SYSTEMSDAEJEON 34325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dursun, Kadir Hürth, DE 8 2
Falkus, Erik-Florian Burscheid, DE 2 0
Guerin, Nuno Cascais, PT 1 0
Salvador, Frau Susana Azeitao, PT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00