Power transmission device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11486482
APP PUB NO 20210190191A1
SERIAL NO

17054487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a power transmission device, which includes: a worm shaft; a Janggu (slim waist drum)-shaped worm which is provided on the worm shaft, and has a diameter-reduced part whose outer diameter is increased toward both ends from a center thereof in an axial direction of the worm shaft, wherein the diameter-reduced part has spiral worm teeth formed thereon; a first transmission shaft disposed in parallel to the worm shaft at an interval; and a first transmission gear which is provided on the first transmission shaft, and includes first gear teeth having tooth shapes conjugated with the worm teeth of the Janggu-shaped worm and are continuously formed in a spiral shape on an outer circumferential surface thereof, thus to rotate by threadedly engaging with the worm teeth of the Janggu-shaped worm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PARALLOID GEAR CO LTDHWANGGEUM-RO 258BEON-GIL YANGCHON-EUP GIMPO-SI GYEONGGGI-DO 10049

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seol, In Hwan Seoul, KR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00