Thermal-insulated multi-walled pipe for superconducting power transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11486531
APP PUB NO 20200200316A1
SERIAL NO

16612758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a thermal-insulated multi-walled pipe for superconducting power transmission that highly prevents intrusion of external heat due to radiation and has excellent thermal insulation property without using a superinsulation. A thermal-insulated multi-walled pipe for superconducting power transmission comprises: a superconducting cable; and a multi-walled pipe that houses the superconducting cable, wherein the multi-walled pipe is composed of a plurality of straight pipes, and at least one of the plurality of straight pipes has, at a surface thereof, a zinc or zinc alloy-plated layer having an average spangle size of 2.0 mm or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATIONTOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishiguro, Yasuhide Tokyo, JP 42 266
Sakashita, Shigeto Tokyo, JP 10 66
Sato, Akio Tokyo, JP 85 687

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00