Process for the commercial production of high-quality catalyst materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493274
APP PUB NO 20210172682A1
SERIAL NO

16602770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention describes an improved process for the commercial scale production of high-quality catalyst materials. These improved processes allow for production of catalysts that have very consistent batch to batch property and performance variations. In addition these improved processes allow for minimal production losses (by dramatically reducing the production of fines or small materials as part of the production process). The improved process involves multiple steps and uses calcining ovens that allow for precisely control temperature increases where the catalyst is homogenously heated. The calcining gas is released into a separate heating chamber, which contains the recirculation fan and the heat source. Catalysts that may be produced using this improved process include but are not limited to catlaysts that promote CO hydrogenation, reforming catalysts, Fischer Tropsch Catalysts, Greyrock GreyCat™ catalysts, catalysts that homologate methanol, catalysts that promote hydrogenation of carbon compounds, and other catalysts used in industry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREYROCK TECHNOLOGY LLC2020 L STREET SUITE 120 SACRAMENTO CA 95811

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schuetzle, Dennis Grass Valley, US 68 243
Schuetzle, Robert Sacramento, US 72 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00