Preparation process of green tea from yerba mate and the respective resulting product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11503839
APP PUB NO 20200205436A1
SERIAL NO

16616112

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention abstract describes the steps of a process for the preparation of green tea and the respective end product, wherein, in the initial step of the proposed process, the young leaves (buds) of yerba mate are subjected to steam at between 90 and 100° for a certain time, the moisture is removed from the steaming step, and, after passing through the steam (steaming step) and twisting, the leaves are cooled (cooling step), rolled (1st rolling), dried for the first time (1st drying), rolled for the second time (2nd rolling), dried for the second time (2nd drying) and separated (segregation step).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JULIANA MONTAGNER—MEILOPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Montagner, Juliana Ilopolis, BR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00