Method of preparing epoxy coated bus bars for use in electrical distribution equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11508495
APP PUB NO 20190189305A1
SERIAL NO

15842037

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automated process for producing exposed electrical contact areas on the conductor part of an epoxy coated bus bar. When the epoxy coating is in the glassy state, one can safely and economically, preferably via automated apparatus, put the epoxy into the rubbery state by positioning the bar and applying localized heat at a select area of the coating; monitoring the heating to above the glass transition temperature of the epoxy, bringing cutting tools into contact with the epoxy for cutting and removing the rubbery coating away from the bus bar, and cooling the bus bar to bring adjacent coating back to the glassy state, thereby leaving an exposed electrical contact area of conductor on the bus bar with little or no surface damage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC USA INCANDOVER MA 01810

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wittwer, John A Cincinnati, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00