Nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11515051
SERIAL NO

16479989

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In view of above problems, an object of the invention is to provide a primary containment vessel venting system having a structure capable of continuously discharging vapor in a primary containment vessel out of the system and continuously reducing pressure of the primary containment vessel without discharging radioactive noble gases to the outside of the containment vessel and without using an enclosing vessel or a power source. In order to achieve the above object, an nuclear power plant of the invention includes a primary containment vessel which includes a reactor pressure vessel, a radioactive substance separation apparatus which is disposed inside the primary containment vessel and through which the radioactive noble gases do not permeate but vapor permeates, a vent pipe which is connected to the radioactive substance separation apparatus, and an exhaust tower which is connected to the vent pipe and discharges a gas, from which a radioactive substance is removed, to the outside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI-GE NUCLEAR ENERGY LTDIBARAKI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Sohei Tokyo, JP 8 1
Hamada, Katsuki Tokyo, JP 1 1
Hidaka, Masataka Tokyo, JP 23 409
Ikegawa, Tomohiko Tokyo, JP 11 24
Ishii, Yoshihiko Tokyo, JP 19 73
Kito, Kazuaki Tokyo, JP 9 23
Matsuzaki, Takahisa Tokyo, JP 7 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00